Free PMP Practice Test: 100 Questions With Answers

Updated on: October 28, 2026

This free PMP practice test has 100 original questions with answers and short explanations. They are weighted like the three domains in PMI’s 2026 exam content outline: People (33 questions), Process (41) and Business Environment (26).

Pick an answer to get instant feedback and a running score. Read every explanation, because the reasoning is what helps on exam day. When you finish, you will see a score for each domain.

Advertisement

Important: these are original practice questions written for study. They are not real exam questions, and this page is not affiliated with or endorsed by the Project Management Institute (PMI). PMP is a registered mark of PMI. Always check pmi.org for the current exam rules.

Working toward a project management job? See our PMP resume example and PMP cover letter sample.

Take the PMP Practice Test

Select an answer to see instant feedback. Your score updates as you go. Study notes, key formulas, the answer key and FAQs are below the quiz.

Quick jump: People (33)Process (41)Business Environment (26)Key formulasAnswer keyFAQs

0 of 100 answered | 0 correct | 0%

People (33 Questions)

1. Two team members disagree about the technical approach, and the debate is slowing the work. The project manager has heard both views. What is the best next step?

Answer: D. Collaborating, or problem solving, deals with the root cause and builds commitment. Escalation is for conflicts the team cannot resolve, and forcing or avoiding usually leaves the problem in place.
2. In the Tuckman ladder, a team starts to challenge each other’s ideas and compete for influence over how the work is done. Which stage is this?

Answer: C. Storming is when disagreements surface as members test roles and approaches. Forming is the polite start, norming is when agreements settle, and performing is when the team works smoothly.
3. A project manager removes obstacles, coaches the team and helps it make its own decisions. Which leadership style is this?

Answer: B. Servant leaders put the team’s needs first and focus on enabling it to succeed. This style is common in agile teams.
4. A normally active team member has been quiet and withdrawn in meetings for two weeks. What should the project manager do first?

Answer: B. Emotional intelligence means noticing changes and responding with a private, respectful conversation. Discussing it publicly or acting without asking can make things worse.
5. Which tool compares the current engagement level of each stakeholder with the level the project needs?

Answer: A. The stakeholder engagement assessment matrix shows gaps between current and desired engagement, such as unaware, resistant, neutral, supportive and leading.
6. On a power and interest grid, how should a stakeholder with high power and high interest be handled?

Answer: D. High power and high interest stakeholders need close, frequent engagement. High power and low interest are kept satisfied, and low power and high interest are kept informed.
7. A senior executive has a lot of influence over the project but shows little interest in the details. What approach fits best?

Answer: C. High power and low interest stakeholders should be kept satisfied without overloading them. Ignoring them risks losing support when decisions are needed.
8. During planning, the project manager learns that a key stakeholder doubts the project’s value. What is the best action?

Answer: C. Early engagement lets the project manager address concerns before they become obstacles. The stakeholder register and engagement plan should be updated.
9. A project team has 8 members. How many communication channels exist among them?

Answer: B. Channels = n(n-1)/2, which is 8 x 7 / 2 = 28. The number grows quickly as the team grows.
10. A remote team must discuss a sensitive issue with many open questions. Which communication method is best?

Answer: A. Interactive communication allows real-time exchange and tone, which suits complex or sensitive topics. Push and pull methods are one-way.
11. Which document describes what information goes to which stakeholders, how often and by which method?

Answer: D. The communications management plan sets out information needs, frequency, format and responsibility for sharing it.
12. An experienced team member who holds a lot of undocumented knowledge is about to leave the project. What is the best way to keep that knowledge?

Answer: D. Tacit knowledge is best shared through personal interaction, such as mentoring, and then documented. A last-day email rarely captures it.
13. When should lessons learned be captured on a project?

Answer: C. Capturing lessons as they happen keeps them accurate and lets the team improve the current project, not only future ones.
14. At kickoff, team members describe different ideas about what the project should achieve. What should the project manager do?

Answer: B. A shared vision keeps everyone aligned. Documenting the agreed vision and objectives gives the team a reference point.
15. In an agile team, who decides how to turn backlog items into working product during an iteration?

Answer: A. Agile teams are self-organizing and decide how to do the work. The product owner decides what is most valuable to build.
16. Which role is responsible for maximizing the value of the product and for ordering the product backlog?

Answer: A. The product owner represents stakeholders’ needs and sets backlog priorities. The scrum master coaches the team and removes impediments.
17. What is the main purpose of a daily stand-up meeting?

Answer: D. The stand-up is short and for the team. It shows progress, plans the day and raises blockers.
18. Why does a team create working agreements, or ground rules?

Answer: C. Working agreements, ideally created by the team, set norms for behavior, meetings and communication, and reduce conflict.
19. According to Herzberg’s two-factor theory, which of the following is a motivator?

Answer: B. Motivators, such as achievement and recognition, increase satisfaction. Pay, security and working conditions are hygiene factors that prevent dissatisfaction but do not motivate by themselves.
20. A project team is spread across several time zones. Which approach is fair and practical for meetings?

Answer: B. Rotating times shares the burden and supports team morale. Recording meetings can help those who cannot attend.
21. A customer casually asks the project manager to add a feature that is not in the scope. What is the best response?

Answer: A. Managing expectations means being open and following the process. The request may be approved, but only after its impact is assessed.
22. The sponsor expects delivery a month earlier than the schedule baseline supports. What should the project manager do?

Answer: D. Aligning expectations uses facts. The project manager can offer options such as reduced scope or added resources and let the sponsor decide.
23. A team member’s work is late and below standard. What is the best first step?

Answer: C. Private, specific and timely feedback helps the person improve. Formal steps come later if the problem continues.
24. The team lacks a skill needed for upcoming work. What should the project manager do?

Answer: C. Closing a skills gap is part of planning and developing the team. The resource management plan should reflect the change.
25. A team votes on a design, and the option with the most votes wins even though it has less than half of the votes. What decision method is this?

Answer: B. Plurality means the largest block decides. Majority requires more than 50 percent, and unanimity requires everyone to agree.
26. In a weak matrix organization, the project manager has limited authority over team members. What is the best way to get the resources the project needs?

Answer: A. In matrix structures, influence and negotiation are key because functional managers control their staff.
27. A team member is explaining a problem. What shows active listening?

Answer: D. Active listening includes paying full attention, reflecting back what was said and asking clarifying questions.
28. A project manager on a global team notices repeated misunderstandings between two regions. What is the best action?

Answer: D. Cultural awareness and clear agreements help prevent misunderstandings and build trust.
29. A team wants to generate ideas and then rank them by anonymous voting. Which technique is this?

Answer: C. Nominal group technique combines brainstorming with a ranking step. Delphi also uses anonymous input, but it uses expert rounds, not a live group.
30. A team member suggests using an AI tool to summarize meeting notes that contain confidential client information. What should the project manager do first?

Answer: B. New tools can help but must follow organizational policy and confidentiality rules, and a human should review the output.
31. What is the purpose of a retrospective at the end of an iteration?

Answer: A. Retrospectives support continuous improvement by looking at process, tools and teamwork.
32. The stakeholder register is created when stakeholders are identified. Which information does it commonly hold?

Answer: A. The register lists who the stakeholders are, what they expect or influence, and how they are classified, and it is updated as the project progresses.
33. A new team member joins in the middle of the project. What best helps the person become productive quickly?

Answer: D. Onboarding that explains the goals, roles, tools and working agreements shortens the learning curve and helps the person join the team.

Process (41 Questions)

34. Which document formally authorizes a project and gives the project manager the authority to apply organizational resources?

Answer: C. The charter is issued by the sponsor or initiator. It names the project manager and gives authority. The business case explains why the project is worth doing.
35. A project has a fixed regulatory deliverable but the software features will keep changing based on user feedback. Which approach fits best?

Answer: B. Hybrid combines predictive planning for fixed parts, such as regulatory milestones, with adaptive delivery for the changing parts.
36. Requirements are well understood, change is unlikely and the work is heavily regulated. Which development approach is most suitable?

Answer: B. Predictive approaches work best when scope, time and cost can be planned in detail up front and change is limited.
37. Which is a characteristic of an iterative or agile life cycle?

Answer: A. Adaptive life cycles deliver in small increments, learn from feedback and adjust the backlog.
38. Which document contains the scope, schedule and cost baselines along with the subsidiary management plans?

Answer: D. The project management plan integrates the subsidiary plans and the baselines used to measure performance. The charter only authorizes the project at a high level.
39. What is the lowest level of the work breakdown structure called?

Answer: C. Work packages are the lowest-level deliverables that can be estimated, scheduled and assigned.
40. Stakeholders keep asking informally for small extra features, and the team adds them without approval while the schedule slips. What is this called?

Answer: C. Scope creep is uncontrolled growth in scope without changes to time, cost or resources. Gold plating is a team adding extras on its own.
41. Which document describes each work package in detail, including deliverables, acceptance criteria and resources?

Answer: B. The WBS dictionary supports the WBS with details about each component.
42. Which items make up the scope baseline?

Answer: A. The scope baseline is the approved version of these three components and can only change through change control.
43. The customer reviews a completed deliverable and formally accepts it. Which process is this?

Answer: D. Validate scope is the formal acceptance of completed deliverables. Control quality checks that deliverables meet quality requirements before this step.
44. In an agile project, what is used to capture and order the work that the team may deliver?

Answer: D. The product backlog lists features, fixes and other work, ordered by value, and is refined as the team learns.
45. What is the critical path?

Answer: C. Activities on the critical path usually have zero total float, so a delay on the path delays the project.
46. What does total float measure?

Answer: B. Total float is about the project end date. Free float is about the next activity.
47. Activity A takes 3 days. After A, activity B takes 5 days and activity C takes 4 days, and both can run in parallel. Activity D takes 2 days and needs both B and C to finish. What is the shortest project duration?

Answer: A. The longest path is A, B, D: 3 + 5 + 2 = 10 days. The path A, C, D is 3 + 4 + 2 = 9 days.
48. What is the difference between fast tracking and crashing?

Answer: A. Fast tracking can add rework risk, and crashing adds cost. Both are schedule compression techniques.
49. In an agile project, what does velocity show?

Answer: D. Velocity, often in story points, helps the team forecast how much it can finish in future iterations.
50. A schedule is adjusted so that people are not assigned to more work than they can handle, even if the end date moves. What technique is this?

Answer: C. Leveling resolves overallocation and can extend the schedule. Smoothing adjusts activities only within their float.
51. A project has a budget at completion of $100,000 and is 40 percent complete according to the plan. What is the earned value?

Answer: B. Earned value is the budgeted value of the work completed: 40 percent of $100,000.
52. A project has earned value of $40,000 and actual cost of $50,000. What is the cost performance index?

Answer: B. CPI = EV / AC = 40,000 / 50,000 = 0.8. A value below 1.0 means the project is over budget.
53. A project has earned value of $40,000 and planned value of $50,000. What is the schedule performance index?

Answer: A. SPI = EV / PV = 40,000 / 50,000 = 0.8. A value below 1.0 means the project is behind schedule.
54. A project has a budget at completion of $100,000 and a CPI of 0.8. If current cost performance is expected to continue, what is the estimate at completion?

Answer: D. EAC = BAC / CPI = 100,000 / 0.8 = $125,000.
55. An activity has an optimistic estimate of 4 days, a most likely estimate of 6 days and a pessimistic estimate of 14 days. What is the PERT estimate?

Answer: C. PERT = (O + 4M + P) / 6 = (4 + 24 + 14) / 6 = 7 days.
56. Which statement about management reserve is correct?

Answer: C. Contingency reserves cover identified risks and sit inside the baseline. Management reserve is for unforeseen work and needs management approval to use.
57. Which of the following is a cost of poor quality, also called cost of nonconformance?

Answer: B. Rework and scrap are failure costs. Training, planning and prevention are costs of conformance.
58. What does a control chart show?

Answer: A. Control charts track data over time against upper and lower control limits to find special causes of variation.
59. In an agile project, what is the definition of done?

Answer: D. A clear definition of done keeps quality consistent and avoids misunderstandings about completion.
60. What does a RACI chart show?

Answer: D. A RACI is a type of responsibility assignment matrix, and each task should have a single accountable person.
61. Which tool organizes resources by category and type?

Answer: C. The resource breakdown structure lists team and physical resources by category, such as labor, equipment and materials.
62. How many people should be accountable for each task in a RACI chart?

Answer: B. Having a single accountable person avoids confusion about who has the final answer, even when several people are responsible for doing the work.
63. Which contract type places most of the cost risk on the seller?

Answer: A. In a fixed-price contract the seller must deliver for the agreed price, so cost overruns are the seller’s risk.
64. A buyer needs help right away, and the scope cannot be defined yet. Which contract type is most suitable?

Answer: A. Time and materials contracts suit uncertain scope, and the buyer should add a cap or oversight to control cost.
65. A buyer wants proposals from sellers and cares about approach, skills and experience, not only price. Which document should the buyer issue?

Answer: D. An RFP asks sellers to propose solutions. An RFQ or IFB is mainly used when price is the main factor.
66. What does a make-or-buy analysis decide?

Answer: C. Make-or-buy analysis compares cost, capacity, skills and risk before procurement starts.
67. What is a minimum viable product?

Answer: B. An MVP lets the team test assumptions early and decide what to build next based on real feedback.
68. A project finishes on time and on budget, but the expected business benefits do not appear. Why should benefits be reviewed after delivery?

Answer: B. Value-based delivery looks beyond outputs to outcomes, so the organization can act if benefits fall short.
69. In MoSCoW prioritization, what does the S stand for?

Answer: A. MoSCoW means Must have, Should have, Could have and Won’t have this time. It helps teams order requirements.
70. Which chart shows the amount of work remaining over time in an iteration?

Answer: D. A burndown chart tracks remaining work and helps the team see whether it is on pace to finish.
71. Which technique compares actual performance with the baseline to explain differences?

Answer: C. Variance analysis finds the size and cause of differences in cost, schedule or scope, so corrective action can be decided.
72. The sponsor has accepted all deliverables. What should the project manager do next?

Answer: C. Closing includes confirming acceptance, finishing contract and financial closure, archiving documents and capturing lessons learned.
73. A project is ended early before completion. What should the project manager still do?

Answer: B. A terminated project still needs closure. Documenting the reasons and lessons helps the organization.
74. Why does a kanban team limit work in progress?

Answer: A. Limiting work in progress makes bottlenecks visible and helps the team finish work before starting more.

Business Environment (26 Questions)

75. What does a project governance framework provide?

Answer: D. Governance defines who decides, how decisions are made and how the project is overseen. It fits the project to the organization’s rules.
76. A steering committee reviews project progress and decides on escalated issues. What is this an example of?

Answer: D. Steering committees are a common governance body that provides direction and decides on matters beyond the project manager’s authority.
77. What is a typical role of a project management office (PMO)?

Answer: C. PMOs range from supportive to directive. They help with standards, tools, training and reporting.
78. A new regulation affects a deliverable that is already in progress. What should the project manager do first?

Answer: B. Compliance needs are assessed for impact and handled through the change process, so the plan and baselines stay accurate.
79. Which tool links requirements to deliverables so the team can show each requirement is met?

Answer: A. Traceability links requirements to their source, deliverables and tests. It also helps prove compliance.
80. What is the purpose of a quality audit?

Answer: A. Audits are structured, independent reviews. They find good practices, gaps and lessons to share.
81. A stakeholder asks the project manager in a hallway to change a requirement. What should the project manager do?

Answer: D. All changes should go through integrated change control so impact is evaluated and approved before work changes.
82. What does a change control board do?

Answer: C. The change control board is a group with authority to approve or reject changes to baselines.
83. A change request has been approved. What should the project manager do next?

Answer: B. Approved changes are implemented, and documents and baselines are updated. The people who are affected need to be informed.
84. What is the difference between a risk and an issue?

Answer: B. Risks are uncertain and can be positive or negative. An issue is a current problem that needs action.
85. A team member reports that a vendor has failed to deliver a component and the work is now blocked. What should be recorded and tracked?

Answer: A. Because the event has already happened, it is an issue. It needs an owner, an action and a date, and may also trigger a change request.
86. In an agile team, what should the team do when it is blocked by an outside group?

Answer: D. Making impediments visible quickly lets the facilitator work with others to remove them.
87. Which statement best describes a risk?

Answer: C. Risk includes both threats and opportunities.
88. Which document lists identified risks, their owners and planned responses?

Answer: C. The risk register is updated throughout the project as risks are identified, analyzed and responded to.
89. Which tool is used in qualitative risk analysis to rank risks by probability and impact?

Answer: B. The matrix prioritizes risks for further analysis or response. Monte Carlo is a quantitative technique.
90. A team buys insurance to cover the cost of a possible equipment failure. Which risk response is this?

Answer: A. Transfer shifts the impact to a third party, but the risk itself does not go away.
91. A project manager adds a more experienced developer to make a positive risk more likely to occur. Which response is this?

Answer: D. Enhance increases the probability or impact of an opportunity. Exploit makes sure it happens.
92. A new risk appears because of the response to another risk. What is it called?

Answer: D. Secondary risks come from implementing a response. Residual risks remain after a response.
93. What does the Plan-Do-Check-Act cycle support?

Answer: C. PDCA is an iterative method for testing and improving a process step by step.
94. Which output of a retrospective or lessons learned session helps future work?

Answer: B. Sessions are valuable only when the team turns insights into actions it follows through on.
95. In the ADKAR model of change, what does the first A stand for?

Answer: A. ADKAR stands for awareness, desire, knowledge, ability and reinforcement.
96. Employees resist a new process that the project will introduce. What is the best approach?

Answer: A. Early involvement and clear communication build understanding and reduce resistance.
97. The sponsor wants the project to reduce its environmental impact. What should the project manager do?

Answer: D. Sustainability goals should be planned and measured like other objectives.
98. Which tool is often used to analyze the external environment, including political, economic, social, technological, legal and environmental factors?

Answer: C. PESTLE looks at outside forces that can affect the project and the organization.
99. A competitor releases a similar product that may reduce the benefits in the business case. What should the project manager do?

Answer: B. Changes in the external environment can affect value. The sponsor and governance body decide whether to change direction.
100. What is the role of a risk owner?

Answer: B. Each significant risk should have a named owner so someone watches triggers and acts on the plan.

Your Score

Section Score

About the PMP Exam

PMI's 2026 PMP exam content outline groups the exam into three domains. The table shows each domain's weight and the kind of work it covers.

Domain Weight What it covers
People 33% Developing a common vision, managing conflict, leading the team, engaging and aligning stakeholders, knowledge transfer and communication
Process 41% Integrated planning, scope, value-based delivery, resources, procurement, finance, quality, schedule, status and closure
Business Environment 26% Governance, compliance, change control, impediments and issues, risk, continuous improvement, organizational change and the external environment

The format below comes from the same outline. PMI can change it, so confirm the details at pmi.org before you book.

Exam feature Details from PMI's 2026 outline
Questions 180 in total: 170 scored and 10 unscored pretest questions
Time 240 minutes, with two 10-minute breaks
Question types Case or scenario, graphic-based, multiple choice, multiple response, and matching or point-and-click formats on computer-based tests
Approaches About 40% of items cover predictive approaches, and the remaining 60% are split between agile and hybrid. The mix can vary by exam form.

How to Use This Practice Test

  1. Answer each question, then read the explanation, even when you were right.
  2. Look at your domain scores at the end and study the weakest domain first.
  3. Think like a project manager: assess the situation, collaborate with the team and stakeholders, and follow the change process before acting.
  4. Practice both approaches. Questions can involve predictive, agile and hybrid projects.
  5. Retry missed questions after a day or two.
  6. Take timed practice exams of full length from PMI or a trusted provider before the real exam.

Key Formulas

These formulas appear in this practice test. Learn them and what each result means.

Topic Formula Example from this test
Communication channels n(n-1)/2 8 people: 8 x 7 / 2 = 28
Earned value (EV) % complete x BAC 40% of $100,000 = $40,000
Cost performance index (CPI) EV / AC 40,000 / 50,000 = 0.8
Schedule performance index (SPI) EV / PV 40,000 / 50,000 = 0.8
Estimate at completion (typical variances) BAC / CPI 100,000 / 0.8 = $125,000
Three-point estimate (PERT) (O + 4M + P) / 6 (4 + 24 + 14) / 6 = 7 days

Score Yourself

Check pmi.org for how the real exam is scored. The ranges below are only a study guide for this page.

  • 90 to 100: excellent. Move on to full-length timed practice exams.
  • 80 to 89: good. Review the questions you missed and your lowest domain.
  • 70 to 79: keep studying. Reread your study guide for the weak topics.
  • Below 70: study the material again, then retake this test in a few days.

Answer Key

Use this key to score yourself quickly. The explanations above tell you why.

Q A Q A Q A Q A Q A
1 D 21 A 41 B 61 C 81 D
2 C 22 D 42 A 62 B 82 C
3 B 23 C 43 D 63 A 83 B
4 B 24 C 44 D 64 A 84 B
5 A 25 B 45 C 65 D 85 A
6 D 26 A 46 B 66 C 86 D
7 C 27 D 47 A 67 B 87 C
8 C 28 D 48 A 68 B 88 C
9 B 29 C 49 D 69 A 89 B
10 A 30 B 50 C 70 D 90 A
11 D 31 A 51 B 71 C 91 D
12 D 32 A 52 B 72 C 92 D
13 C 33 D 53 A 73 B 93 C
14 B 34 C 54 D 74 A 94 B
15 A 35 B 55 C 75 D 95 A
16 A 36 B 56 C 76 D 96 A
17 D 37 A 57 B 77 C 97 D
18 C 38 D 58 A 78 B 98 C
19 B 39 C 59 D 79 A 99 B
20 B 40 C 60 D 80 A 100 B

Frequently Asked Questions

Click a question to see the answer.

Are these real PMP exam questions?

No. They are original practice questions written for study, and they are not from the real exam. The real exam has its own questions and formats, so use this page to check your understanding and find weak areas.

How many questions are on the real PMP exam?

PMI’s 2026 exam content outline lists 180 questions, of which 170 are scored and 10 are unscored pretest questions, with 240 minutes to finish. Confirm the current details at pmi.org.

What are the PMP exam domains?

The 2026 outline has three: People (33%), Process (41%) and Business Environment (26%). This practice test uses the same weights.

Do I need to know agile for the PMP exam?

Yes. The outline says about 40% of items cover predictive approaches, and the remaining 60% cover agile and hybrid approaches. Practice with all three.

What should I study besides practice questions?

Study the PMI exam content outline first, then a current study guide or the official PMI materials, and take full-length timed practice exams. Use this test to find your weak topics.

What score do I need on this practice test?

There is no official passing score for this page. Aim for at least 80 percent in every domain, then confirm your readiness with full-length practice exams.

Who can take the PMP exam?

PMI sets eligibility rules based on education and project experience, and they can change. Its 2026 exam page mentions expanded eligibility and a 10-year window for experience. Check pmi.org for the current requirements.

What is the best way to answer scenario questions?

Read the whole scenario, find what is really being asked, and eliminate answers that skip steps, such as acting before assessing impact or going to the sponsor before talking to the team. The best answer is usually the one a collaborative, process-aware project manager would choose.

Conclusion

Practice questions work best when you read each explanation, track your weak domains and retest them. Work through all 100 questions, retry the ones you missed and add full-length timed exams before the real test. When you are ready to apply for roles, build your resume with our project manager resume example.

Related Reading

Sources: PMI, PMP Examination Content Outline (2026); PMI, the new PMP exam. PMP is a registered mark of the Project Management Institute, which does not endorse this page. Questions are original.

Advertisement