Concrete Pump Operator Resume Sample

Choosing a concrete pump operator resume format that works for you is very important.

Not all resume formats allow you to do what you want to do.

But if it is basic information that you would like to put into your resume, you may choose a standard format that works well in almost all situations.

Just make sure that the information which you place into it is not too standard!

Format? Here is a sample:


Concrete Pump Operator Resume Sample



Sheldon Cooper

56 Y Street | Auburn, NE 82136 | (000) 521-8547 | sheldoncooper @ email . com


Physically dexterous, detail-oriented and mechanically inclined.

Performance Summary
Over 7 years of experience working as part of a construction crew. Exceptionally skilled in operating and maintaining concrete pumps, truck mounted concrete boom pumps and related tools.

Effectively evaluate the conditions of sites, set up trucks in a proper manner, and load and unload attachments according to specified protocols. Always comply with safety regulations and precautionary measures while operating concrete pumps.

Professional Skills

✓ Pump Mounting✓ Tools Maintenance✓ Precautionary Measures
✓ Site Inspection✓ DOT Regulations✓ Truck Set-up
✓ Project Paperwork✓ Post-trip Inspections✓ Line Systems Awareness
✓ Pressure Gauging✓ Control Systems Operation✓ Safety Measures



Gant Concrete Pumping, Auburn, NE | 2013 – Present
Concrete Pump Operator
• Perform pre-trip inspections of concrete pumps to ensure that they conform to federal DOT regulations
• Fill pump water tank before each project and ensure that the valves are properly shut
• Drive concrete pump-mounted trucks to specified construction locations in a punctual manner
• Evaluate site conditions and work with contractors to set up the truck in the right place
• Operate boom and pump as specified to place concrete in desired locations
• Load and unload concrete pump attachments and ensure that pump systems are properly cleaned after job completion
• Keep dispatchers informed of project statuses through cell phones, and take and respond to orders for further projects
• Perform preventative and general maintenance on concrete pump machines, tools and equipment

Selected Achievements and Contributions
• Simultaneously provided support to 3 field projects, by providing them with required amount of concrete, during a low staff instance.
• Implemented a series of precautionary measures relating to concrete pump placement on construction sites.

Almo’s Construction Company, Auburn, NE | 2010 – 2013
• Referred to work orders and supervisor’s instructions to determine daily tasks
• Performed activities such as digging trenches and holes according to specified instructions
• Cleared work areas of debris and hazardous materials to make them ready for construction work
• Erected scaffolding and structures according to provided blueprints and drawings
• Ascertained that all tools and equipment were properly stored at the end of each shift

Selected Achievements and Contributions
• Successfully saved 2 laborers from imminent fatality by recognizing signs of danger and pushing them out of harm’s way.
• Introduced the concept of preventative maintenance on concrete pumps and related equipment, reducing chances of breakdowns and malfunctions.

Auburn High School, Auburn, TN – 2009
High School Diploma

Current Class B CDL with clean driver record

“I am detail oriented with great attention to detail and effectively care of equipment and property.”

Last updated on